Water lines are being installed at Prospect Avenue and Ian Way.
Concrete curbs, gutters, sidewalks and driveways will
continue to be poured from Cottonwood Avenue east towards Railroad
Avenue. Please avoid driving and walking on the fresh concrete to allow
the concrete to properly cure.
On Saturday, the north portion of asphalt on Prospect Avenue
(Cottonwood to Railroad) will be ground out. Repaving will take place through
Friday. The same process will occur in the center section of the street between 10611 and 10728 Prospect Avenue.
Work days and hours will be Monday through Saturday from 6 a.m.to 6 p.m.
Please observe the 25 mph speed limit within the
construction zones. Traffic fines will be doubled within the construction
zone.
If you have any project related questions, please feel free
to contact Toby Espinola, P.E., City of Santee, 619-258-4100 x 174.