Prospect Ave Corridor Enhancement Project Update

Monday, April 21, 2014

Storm drain work

This week we’re installing more electrical conduit so we can underground overhead electric wires. This work will continue east of Cottonwood Avenue.

We’re also installing storm drain structures called curb inlets and catch basins on the south side of Prospect Avenue.

There’s also work being done on a retaining wall near Magnolia Avenue.

SDG&E is lowering gas pipes to allow us to install the new storm drain system.

The third of seven structures slated for demolition has been completed near Magnolia Avenue.


Building retaining wall
 
Work days and hours are 6 a.m. to 6 p.m. Monday through Saturday.

Please observe the 25 mph speed limit within the construction cone zone, where traffic fines are subject to being doubled.  

Questions? Contact senior civil engineer Toby Espinola at 619-258-4100 x 174.